DATUM

Placed and finished since 2004
Slabs Polished floors Stairs Board-formed walls
A freshly power-floated concrete slab shot from directly above, flat and pale with a crisp formwork edge Level to ±3mm Saw cut at 6m centres
WorkDetailTypical
SlabsWaffle and raft, set out from your engineer's plan.2 to 4 days
Polished floorsGrind, densify, three-stage polish. Exposed or salt and pepper.4 days
StairsCast in situ, board-formed or off-form finish.1 week
WallsBoard-formed feature walls, timber grain carried through.By drawing
A polished concrete floor with a mirror finish reflecting a full-height window
Timber formwork and an orderly grid of steel reinforcement mesh before a pour

Flat is a decision you make weeks before the pour.

A cast in-situ concrete stair with board-formed texture and raking light down the treads Board-formed, 140mm boards
Set out with us before the engineer signs off 02 5550 5120 pour@datum.concrete